Camp Alvarado Physical Security Upgrades Kabul, Afghanistan

Camp Alvarado Physical Security Upgrades Kabul, Afghanistan

The scope consists of design and construction of Camp Alvarado Compound upgrades located in the Kabul International Airport area. The project is executed in a certain phasing plan, including night-shifts, to allow for un-interrupted operational functions of the facilities. Project involves design and construction of overhead steel canopies, sidewalls, T-walls on and around the existing buildings and bunkers, and construction of access building with fence and vehicular and pedestrian gates. Civil works involve connection lines to be tied-in to the nearest mains or branches, and roadways to the access building.

Location:

Kabul, Afghanistan


Client:

U.S. Department of State Overseas Buildings Operations (OBO)


Contractor:

FCE JV


Contract Amount:

$ 24,350,000


Start Date:

1.9.2013


Completion Date:

1.11.2016


Duration:

3 Year 2 Month 17 Days